Working with Intrastack

The Intrastack Process

Intrastack’s focus is on having the earliest possible involvement with your project. Through this approach we can ensure that the Intrastack LGSF system is optimised to meet your specific project requirements, and that waste, inefficiency, and unnecessary cost is designed out – whilst providing a smooth, professional, and excellent customer-experience.

Our project milestone check points guarantee each project is on track, and stays that way.

Tradesperson-in-front-of-crane-with-tools-and-paperwork

The Intrastack Process

icon-of-design-tools

Design

icon-of-manufacturing-machinery

Manufacture

icon-of-distribution-truck

Distribute

icon-of-crane

Install

icon-of-clipboard-business-person-installer

Key Milestone 1: Preparation & Brief

  • Project and building performance specification details discussed
  • Intrastack system design guidance & example details reviewed
  • Intrastack system accreditation information provided
  • Key project supply-chain contacts established
Tradesperson-on-laptop-with-design-plans

Key Milestone 2: Concept Design

  • Sharing of architectural designs
  • Feasibility study completed
  • Intrastack Installers introduced to Pincipal Contractor
  • Budget costing & outline installation programme developed
Tradesperson-with-laptop

Key Milestone 3: Techical Design

  • Detailed quotations to Intrastack Installers
  • Intrastack Installer selected, then appointed by Principal Contractor
  • Installer places design & supply order with Intrastack
  • Upon design-freeze, a full set of General Arrangement drawing are produced for pre-manufacture review
cogs-with-screwdriver

Key Milestone 4: Manufacture & Assembly

  • Site call-off schedule agreed between the installer and Intrastack
  • Intrastack commences panel manufacture & assembly for call-off
  • Any site-applied sections, stairs, balconies and fabricated ready for call-off
tradesperson-in-front-of-crane-with-checklist

Key Milestone 5: On-site Installation

  • Intrastack system components delivered to meet schedule
  • Intrastack installation take places with regular on-site visits throughout
  • Engineering & technical support provided if required
Tradesperson-in-front-of-crane-with-tools-and-paperwork

Key Milestone 6: Handover

  • Intrastack steel frame system-installation completed
  • Any project-specific documentation & warranties provided
  • Complete project information pack issued
  • Post-project review meeting held