Flexible approach
Intrastack introduced its panellised light gauge steel frame system as a solution for The Heights, with the installation of the LGSF structure completed in only 12 weeks.
With the site located on a former car park, adjacent to a quarry, a train line and existing residential dwellings, the project required a flexible approach to overcome these obstacles.
The Intrastack system benefited the site’s logistics by providing planned, sequenced deliveries of exact quantities, with limited vehicle movements required. Because of the site’s restricted access, rigid lorries were required to make the panel deliveries, with a total of 432 panels being taken to site.
While the tight site layout posed challenges, Intrastack’s easy-to-stack and store components made on-site storage and assembly efficient and straightforward.
In terms of waste reduction, the Intrastack system ensured exact quantities were made and delivered, with the efficient cut-to-length and panellisation process resulting in minimal waste both on and off-site. The steel-based system allowed for a 50 per cent reduction in concrete deliveries to the project.
The Intrastack solution also helped to elevate the development’s specifications, with a steel frame system that has the potential to deliver an impressive U-Value of 0.14W/m2K when specified in conjunction with other energy-efficient building materials.